Heliwalls

Excavation shoring is a significant factor in your construction projects cost and schedule. Heliwalls patented shoring technology offers an innovative, value-added approach resulting in substantial savings to your bottom line.

We are the sole manufacturer/distributor of the Heliwalls Shoring System in the United States.

Who We Serve

Heliwalls is based in Omaha, NE. Our reusable panels are available for commercial construction projects across the United States.

Heliwalls | Omaha, NE | Construction icon

Engineers & Architects

 

Heliwalls | Omaha, NE | Construction icon

General Contractors

 

Heliwalls | Omaha, NE | Construction icon

Installing Contractors

 

What We Do

We manufacture and supply the Heliwalls shoring system using our purchase and lease programs through our nationwide distribution channels.

Why Use Heliwalls

Heliwalls is a helically driven, all-steel excavation shoring product with an engineered interlocking design for projects up to 16 feet. This design is considerably more efficient than other methods.

Projects using the Heliwalls Shoring System are typically 30% less expensive than other shoring systems. Heliwalls limits disruption to nearby buildings and can be installed up to three times faster than traditional shoring methods.

Recent Projects

Delivery Method: Shortek/Heliwalls System Owner:  Hurley Construction
Shoring Engineer:  RECAD

PRODUCT DESCRIPTION
Lineal Footage of Shoring
:  52 Lineal Foot of 12-ft shorting, 110 lineal feet of 16-ft shoring
Number of Shoring Panels Used:  41 Panels
Shoring Panels Used:  HW-12   12-ft panels, HW-16   16-ft panels
Product Condition:  Used Panels
Installation Time: 2 days
Removal Time:  2 days
Days Installed:  54
Soil Type:  Silty Clay
Weather Conditions: Cold/Rainy
Equipment Used:  John Deere 160, Track Skid Steer, Bobcat 435 Mini Excavator

Delivery Method: Shortek/Heliwalls System
Owner:  Rohit Communities
Shoring Engineer:  RECAD

PRODUCT DESCRIPTION
Lineal Footage of Shoring
:  288 Lineal Foot
Number of Shoring Panels Used:  72 Panels
Shoring Panels Used:  HW-16   16-ft panels
Product Condition:  Used Panels
PanelsInstallation Time: 4 days
Removal Time: –
Days Installed:  –
Soil Type:  Stiff Clay
Weather Conditions: Warm/Dry
Equipment Used:  John Deere 330, JD 160, Track Skid Steer, Bobcat 435 Mini Excavator
Laborers: 5

Project Type:  12-ft Excavation Shoring
Delivery Method: Shortek/Heliwalls
System Owner:  Enbridge
Shoring Engineer:  RECAD

PRODUCT DESCRIPTION
Lineal Footage of Shoring
:  96 Lineal Foot
Number of Shoring Panels Used:  28 Panels
Shoring Panels Used:  HW-12, 12-ft panels
Product Condition:  Used Panels
Installation Time: 2 days
Removal Time:  1 days
Days Installed:  19
Soil Type:  Firm Clay
Weather Conditions: Warm/Sunny
Equipment Used:  John Deere 160, Track Skid Steer, Bobcat 435 Mini Excavator
Laborers: 4

Project Type:  12ft-14ft Excavation Shoring
Delivery Method: Shortek/Heliwalls
System Owner:  Shamrock Development
Shoring Engineer:  RECAD/MC Schaff

PRODUCT DESCRIPTION
Lineal Footage of Shoring:  365 Lineal Foot
Number of Shoring Panels Used:  92 Panels
Shoring Panels Used:  HW-12(12-ft), HW-16(16-ft)
Product Condition:  New Panels
Installation Time:  3 days
Removal Time:  3 days
Days Installed:  332 days
Soil Type:  Lean Clay
Weather Conditions: Warm/Dry for Install and Removal.  Panels were installed through 4 weather seasons.
Equipment Used:  John Deere 350, Bobcat 770 Track Skid Steer, Mini Excavator
Laborers: 4

Project Type:  8-ft Excavation
Shoring Project Type:  8-ft Excavation Shoring Delivery Method: Shortek/Heliwalls
System Owner:  Enbridge
Shoring Engineer:  RECAD

PRODUCT DESCRIPTION
Lineal Footage of Shoring:  246 Lineal Foot
Number of Shoring Panels Used:  62 Panels
Shoring Panels Used:  HW-8, 8-ft panels
Product Condition:  Used Panels
Installation Time:  3 days
Removal Time:  3 days
Days Installed:  98
Soil Type:  Stiff Clay
Weather Conditions: Cold/Frozen
Equipment Used:  John Deere 160, Track Skid Steer, Bobcat 435 Mini Excavator
Laborers: 4